WAP手机版 RSS订阅 保存到桌面加入收藏设为首页

软件升级6.0简介  绿建设计评价软件 V6.0 试用版 绿建设计评价软件 V6.0 正式版
新标准申报格式文本1 新标准申报格式文本2

会员专区 绿建条文 绿建清单 视频列表 下载中心 绿建产品 绿建学院 绿建服务 购买指南

绿色案例
当前位置:首页 > 工程案例 > 绿色案例

Woods Hole研究中心

时间:2013-07-12 16:36:08   作者:本站编辑   来源:能源世界   阅读:3454  
内容摘要:WoodsHole研究中心泳池设备Theintegrationofpassive-solarandenergy-conservationstrategies,optimalperformance,andon-siterenewablepowergenerationmaketheb...

Woods Hole研究中心

泳池设备

Woods_Hole研究中心

The integration of passive-solar and energy-conservation strategies, optimal performance, and on-site renewable power generation make the building 83% more efficient than a minimally ASHRAE-compliant building.

A grid-connected, net-metered photovoltaic array; a closed-loop, ground-source heat-pump system; and a solar-thermal hot water system supply renewable electricity, heating and cooling, and water. Hydronic distribution provides silent radiant heating and cooling, and valance convectors offer individual zone control and much greater efficiency than conventional fan coil units. A planned on-site wind turbine will yield a net surplus of energy for the building.

Careful detailing of the building envelope stands foremost among the strategies used to achieve the project’s ambitious energy goals. Icynene spray foam insulates all exterior walls and roof assemblies, providing an extremely effective air barrier and optimized R-values. Other features that further enhance its performance include:

Offset-stud framing in the exterior walls to eliminate thermal bridging;
Double- and triple-glazed low-e glazing;
Energy recovery ventilators using enthalpy wheels to recapture exhaust heat and moisture and to precondition incoming fresh air;
An extensive energy-monitoring system that records electrical production and usage, as well as overall system performance;
High-efficiency lighting controls and occupancy monitors;
High-efficiency appliances and office machines.

A simple interior materials palette – most of which can be defined as either "silica" (glass, stone) or "cellulose" (wood) – supports the health of the building’s occupants and local and distant ecosystems while reinforcing the project’s design principles.

手机扫一扫,访问该文章

标签:绿色  节能  woods  hole  




工程案例

本栏最新更新

本栏推荐

阅读排行

点击这里给我发消息 绿建资讯网会员群 绿建之窗

绿建集成网:www.gbwindows.net


185 0112 6985(同微信

LEED AP WELL AP

通信地址 北京市丰台区汽车博物馆东路1号诺德中心2期6号楼1201   邮编:100070 网站合作QQ:1658253059  电话: 13693161205 18501126985

绿建之窗网站已运行:4289天21时55分17秒
  京公网安备11010602007284号  京ICP备14061276号-3 网站数据概况 - 最近活跃访客11今日访问人数522今日访问量1,451昨日访问人数2,024昨日访问量6,179本月访问量163,956总访问量2,219,239 51LA统计